Industrial · Design, build, operate
Baghdad Precast Factory
A 301.8 kWp rooftop plant designed, built and operated by Tanweer. It runs alongside the grid and the factory's diesel generators under a hybrid controller, with provision for battery storage.

Solar energy costs the factory less per kilowatt-hour than diesel generation, so the plant lowers its operating costs as well as its emissions.
301.8 kWp
System
- Capacity
- 301.8 kWp
- Modules
- 348 × LONGi Hi-MO 6, 575 W
180 × LONGi Hi-MO 6, 565 W - Inverters
- 3 × SMA Sunny Tripower CORE2, 110 kW (330 kW total)
- Configuration
- Grid, PV and diesel under a hybrid controller; provision for battery storage
- Monitoring
- SMA Data Manager, SMA Energy Meter
- Scope
- Design, build and operate
- Completed
- November 2023